Richmond Pohara Holdings Ltd (Richmond Rd, Pohara, Golden Bay)
Process on Hold at Applicant's Request: 18 May 2015
Application Details
Applicant
Richmond Pohara Holdings Ltd
Applicant’s Address for Service
Staig & Smith Ltd, PO Box 913, Nelson 7040, Attention: J McNae
Location
Richmond Road, Pohara, Golden Bay
Legal Description
Lot 1 DP 356730 CT 231292
Consent Type, Application Number and Proposal
Subdivision Consent (Application RM141105)
To subdivide Lot 1 DP 356730 to create the following:
- 32 residential allotments of between 510 square metres and 1030 square metres;
- one allotment (Lot 36) of 1.39 hectares to contain an existing dwelling;
- Lot 34 of 0.6605 hectares to vest as road as Roads A, B and C;
- Lot 29 of 1000 square metres to vest as Local Purpose Reserve;
- a balance area allotment (Lot 35) of 46.13 hectares.
Consent is sought to stage the subdivision as follows:
- Stage 1A – proposed Lot 36;
- Stage1B – Lots 1-10 and part of Road A;
- Stage 2 – Lots 11-21 and part of Road A and Road B;
- Stage 3 – Lots 22-34 and part of Road A and Road C.
A 10 year consent period is sought to give effect to the subdivision consent.
The land is zoned Rural 2 under theTasman Resource Management Plan.
Land Use Consent (Application RM141106)
To construct a single dwelling on each of the proposed residential allotments (Lots 1-28 and 30-33) in accordance with the Residential Zone standards including bulk, location and height provisions except a reduction in the Rural Zone building setback is sought for Lots 5 and 6 and Lots 30-33 providing a 5 metre setback from the boundary with proposed Lot 35.
A 10 year consent period is sought.
Land Use Consent (Application RM141107)
To undertake earthworks for the proposed subdivision.
A 10 year consent period is sought.
Land Use Consent (RM141109)
To construct and build a stormwater detention dam.
A 10 year consent period and 35 year term of consent is sought.
Works in Watercourse Consent (Application RM150277)
To carry out works in a stream bed for the proposed stormwater detention dam.
A 10 year consent period and 35 year term of consent is sought.
Water Permit (Application RM141111)
To dam water, by way of a stormwater detention dam in a catchment larger than 20 hectares.
A 35 year term of consent is sought.
Discharge Consent (Application RM141110)
To discharge stormwater from the proposed subdivision.
A 35 year term of consent is sought.
Application Documents
- 1 - 20150402 TDC Amd RC App (pdf, 17 KB)
- 2 - T&T Letter of Clarification 13 Mar 2015 (pdf, 2.9 MB)
- 3 - Table of Contents (pdf, 11 KB)
- 4 - Application Land Use & Subdivision Consent (pdf, 346 KB)
- 5 - Appendix 1 - Subdivision Plans (pdf, 2.2 MB)
- 6 - Appendix 2 - Site Development Plans (pdf, 2.2 MB)
- 7 - Appendix 3 -Roading & Servicing Report (pdf, 2.8 MB)
- 8 - Appendix 4 - Flooding & Stormwater Management Rpt (pdf, 6.7 MB)
- 9 - Appendix 5 - 2014 Letter Pohora Subdivision (pdf, 278 KB)
- 10- Appendix 5 - Revised Report 111011 FINAL (pdf, 278 KB)
- 11 - Appendix 5 - Final Graphic attachment Pohara (pdf, 11 MB)
- 12 - Appendix 6 - Geotech Assmt update (pdf, 6.7 MB)
- 13 - Appendix 7 - Archaeological Assmt (pdf, 69 KB)
- 14 - Appendix 8 - CFR 231292 (pdf, 259 KB)